Sign In | Join Free | My uabig.com
China Jiaxing Chuanqi Machinery Equipment Co., Ltd. logo
Jiaxing Chuanqi Machinery Equipment Co., Ltd.
Jiaxing Chuanqi Machinery Equipment Co., Ltd.
Verified Supplier

3 Years

Home > PP Strapping Band Production Line >

Two-Stage Water Removal System for Dry Product Before Winding – PP Strapping Line

Jiaxing Chuanqi Machinery Equipment Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Two-Stage Water Removal System for Dry Product Before Winding – PP Strapping Line

Brand Name : CHUQI

Model Number : CQ-SPP120-6

Place of Origin : CHINA

MOQ : 1SET

Payment Terms : T/T

Supply Ability : 10SETS

Delivery Time : 60DAYS

Packaging Details : WOODEN BOX

Water removal stages : Two

First stage power : 4KW

Second stage power : 7.5KW

Number of units : 4 each

Working principle : High-pressure airflow

Result : Completely dry

Contact Now

Two-Stage Water Removal System for Dry Product Before Winding
Product Overview

Residual moisture on the tape surface, if carried into subsequent embossing or winding processes, can cause unclear embossing, roll adhesion, or mildew. This production line is equipped with a two-stage water removal system to ensure complete drying before further processing.

System Operation

The first water removal device, located after the first cooling tank, uses a high-pressure centrifugal fan (4KW) with 4 suction pipe sets to initially remove bulk water. The second water removal device, at the outlet of the secondary cooling tank, features a high-pressure centrifugal fan (7.5KW) and 4 water removal units for efficient, fine drying. The two-stage system works together to ensure the tape entering the embosser and winder is completely dry.

Main Specifications
  • First water removal device: 4 suction pipe sets, high-pressure centrifugal fan 4KW
  • Second water removal device: 4 water removal units, high-pressure centrifugal fan 7.5KW
  • Working principle: High-pressure air blowing across top and bottom surfaces
  • Installation positions: After first tank, after secondary tank
Technical Parameters
Item First Water Removal Second Water Removal
Number of units 4 suction pipe sets 4 water removal units
Fan power 4 KW 7.5 KW
Fan type High-pressure centrifugal High-pressure centrifugal
Target 6 PP strands 6 PP strands
Installation position After first cooling tank Outlet of secondary cooling tank
Frequently Asked Questions
Why are two stages of water removal needed? Isn't one enough?
After the first tank, a large amount of water adheres to the tape surface; one stage can remove about 80%. However, the remaining water film still needs strong blowing. The second stage uses a more powerful fan to ensure complete dryness, especially adapting to reduced water splash at high speeds.
Will the airflow from the water removal units blow the tape off course?
The design uses a fan-shaped airflow with adjustable angle, directed tangentially to the tape surface, primarily generating shear force to peel off the water film, with minimal impact on the tape's running path. Proper adjustment prevents wandering.
Are the fans noisy?
High-pressure centrifugal fans do generate some noise, but the equipment includes noise reduction measures and protective covers. For noise-sensitive environments, optional additional sound enclosures or remote fan installation can be provided.

Product Tags:

PP strapping band water removal system

      

Two-stage drying system for strapping

      

High-pressure airflow drying equipment

      
Wholesale Two-Stage Water Removal System for Dry Product Before Winding – PP Strapping Line from china suppliers

Two-Stage Water Removal System for Dry Product Before Winding – PP Strapping Line Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Jiaxing Chuanqi Machinery Equipment Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)